ߣߣÊÓƵapp

Back
Insights
glass buildings with green trees
Decarbonising the Built Environment - EPC, MEES and the Cost Implications
Back
G&T employee with Apprentice
Building future skills at Broadgate
Find out more
Back
Soldiers marching
Why the built environment provides a great career path for military leavers
Discover more
Aj200 Jaguar Landrover

AJ200 Engine Manufacturing Facility - Jaguar Landrover

The initial project comprises the construction of a new machine hall and engine assembly workshop (Module 1) of approximately 73,000m² on the i54 Site in Pendeford near Wolverhampton. This scope was then extended to include an additional assembly workshop on the site (Module 1A).

The two main buildings, the machine hall and the assembly hall, are divided by a third building which accommodates over two storeys the main reception area, conference and exhibition space, staff and visitor restaurant as well as general offices and meeting rooms.

The external envelope construction is mainly to a curtain wall and cladding to a structural steel frame, with specialist ground floor slabs, precast planks and metal staircases internally. There is a mixture of proprietary and glazed partitions to form the designated areas. The additional assembly hall of Module 1A is a replica of the original assembly hall in Module 1.

Client

Jaguar Land Rover

Location

i54 Site Wolverhampton

View all projects on map

Next Project

McLaren Production Centre

View Project
Copy the URL below and share: