ߣߣÊÓƵapp

Back
Insights
Employees sitting in G&T office
Putting Tenants First - Future Proofing Sustainable Spaces for Life Sciences
Back
G&T employee with Apprentice
Building future skills at Broadgate
Find out more
Back
Soldiers Adobe Stock 39369548
Why the built environment provides a great career path for military leavers
Discover more
Buchanan Wharf Building6 gtwebland

Stac, Buchanan Wharf

Stac is the final phase of the award-winning development creating a new neighbourhood with four buildings and significant public realm, including cycle lanes and landscaping, on the banks of the River Clyde.

The project brief was to align with the UKGBC's Advancing Net Zero principles and this EPC 'A' rated building is expected to achieve BREEAM 'Excellent' and NABERS 5 Star ratings.

Operational carbon targets were set at the outset of the project - which were subsequently bettered by the project team. This was achieved by ensuring that the building structure and façade were designed in an efficient manner, minimising the volume of material used and maximising the performance of the building envelope.

This was supplemented with the low carbon building materials and technology, including recycled steelwork, low carbon concrete, low energy building services installations and Photovoltaic panels.

Client

Drum Property Group

Location

Glasgow

View all projects on map

Next Project

2 & 3 Angel Square

View Project
Copy the URL below and share: